How to ship a feature

This is the full planning → execution path. Greenfield starts in Idea Lab. If the project already has an MVP, use Continue planning for the next wave instead of /projects/new. Existing SaaS uses /projects/new?mode=existing first, then the same Idea Lab wave steps.

Delivery phases are not optional. UX Spec is skippable when the wave has no UI. The backlog should use DoD templates on stories before you plan a sprint.

  • Who: Planner shipping one feature or wave
  • Time: Hours to days — not a 15-minute loop
  • Plan: Pro+ to run sprints. Free can generate a PRD and backlog, not a sprint.
  • Turn an idea or next-wave goal into a ranked backlog.
  • Skip UX Spec only for non-UI work.
  • Run the sprint Native, or connect an agent on Pro+.
  • You are adding a real slice of product, not just minting an MCP key.
  • You already know Path A vs Path B from Choose your path.
  • Planner seat (Owner, Admin, or Member with planning).
  • Pro+ if you need an ACTIVE sprint this week.
  • New idea: /projects/new → Idea Lab.
  • Next wave: project → Continue planning.
  • Existing product: /projects/new?mode=existing.
  1. Start Idea Lab (or Continue planning / existing-product living PRD → next wave).
  2. Generate and finalize the PRD (or review the living PRD).
  3. Approve delivery phases. Do not skip this step.
  4. Approve UX Spec, or skip it if this wave has no UI.
  5. Build the backlog. Apply DoD templates on stories that need them.
  6. On Pro+: run sprint planning, start the sprint ACTIVE, put work on Native (or Connected if Enterprise).
  7. Execute on the board, Today / My Tasks, or Connect coding agent (one task per turn).
  • A finalized PRD (classic or living) and a populated backlog exist.
  • On Pro+, an ACTIVE sprint has claimable work. On Free, you stop at backlog and know why.
  • Apply DoD templates from the Product Backlog page, not from a hidden time-tracking module.
  • Agents must not overwrite synced Connected status.
  • Promising this whole path in 15 minutes.
  • Asking an agent for a full rewrite backlog on an existing product.
  • Skipping delivery phases because UX Spec was skipped.