Agent-first workflow
Overview
Section titled “Overview”Three skills cover the agent surface: growthos-sprint-dev (tickets), growthos-product-context (seed living PRD from a repo), growthos-prototype-design (UX Spec → Figma MCP, write figmaUrl back). Pair Figma’s remote MCP with the last one.
The sprint skill is one task per turn: ask before claim, implement, ## Agent handoff, DONE, stop. Ask before advance_sprint. Humans still own PRD finalize, UX Spec approve/skip, sprint start, and Connected policy.
Who / time / plan
Section titled “Who / time / plan”- Who: Engineer or founder who wants the agent to drive tickets
- Time: After keys + an ACTIVE sprint (or living PRD explore)
- Plan: Free: 1 MCP handoff. Pro+: unlimited handoffs. Sprints still Pro+.
What you can do here
Section titled “What you can do here”- Keep one
gos_key per human, never a shared company key. - Switch skills: explore repo, design in Figma, then sprint loop.
- Stop the agent for judgment calls (scope, skip UX Spec, Connected).
When to use
Section titled “When to use”- You trust the board more than a chat transcript as the work queue.
- You want MCP as the default interface after planning.
Prerequisites
Section titled “Prerequisites”- MCP connected at
https://mcp.growthos.salesshuru.com/mcp. - For sprint loop: ACTIVE sprint and claimable Native tasks.
Where to find it
Section titled “Where to find it”- Settings → API Keys & Agents — config, prompts, SKILL.md downloads.
- Sprint board → Connect coding agent.
Step-by-step
Section titled “Step-by-step”- Mint a key and paste Cursor/Claude config. Confirm MCP auth.
- Download the skill you need this hour (sprint, product-context, or Figma).
- State the project id. Let the agent propose; you confirm.
- One task (or one seed / one Figma screen batch as the skill says). Then stop.
- Humans: finalize PRD, approve phases, start sprint, decide Connected vs Native.
What success looks like
Section titled “What success looks like”- Each agent turn leaves an audit trail on the ticket or living PRD.
- You did not bulk-claim the sprint.
Tips & best practices
Section titled “Tips & best practices”- On Connected projects, never overwrite synced status.
- Product-context is for next-wave living PRD, not a rewrite backlog.
Common mistakes
Section titled “Common mistakes”- Running all three skills in one vague prompt.
- Skipping confirm-before-claim because you are “agent-first”.