Next wave after MVP
Overview
Section titled “Overview”After MVP, add the next ranked slice with Continue planning. That re-enters Idea Lab for a new wave: phases, UX Spec skip-or-not, wave backlog. A new /projects/new would burn a project slot and split history.
Existing-product projects should also Continue planning for later waves — still next-wave only, never a rewrite dump.
Who / time / plan
Section titled “Who / time / plan”- Who: Planner after the first backlog wave shipped or is in flight
- Time: A planning session, not a new workspace
- Plan: Same project limits as your plan (Free = 1 project — Continue planning is how you stay inside it).
What you can do here
Section titled “What you can do here”- Add a wave without creating a second project.
- Keep living or classic PRD history on one project.
When to use
Section titled “When to use”- Sprint 1 is done or in flight and you have a new goal.
Prerequisites
Section titled “Prerequisites”- An existing GrowthOS project with at least one planned wave.
Where to find it
Section titled “Where to find it”- Project home → Continue planning.
- Idea Lab on that same project.
Step-by-step
Section titled “Step-by-step”- Write the next-wave goal in one sentence.
- Open Continue planning — not
/projects/new. - Approve new delivery phases. Skip UX Spec only if this wave has no UI.
- Generate the wave backlog. On Pro+, plan the next sprint from it.
What success looks like
Section titled “What success looks like”- One project, two (or more) waves. No orphan second project.
Tips & best practices
Section titled “Tips & best practices”- Free’s 1-project cap makes Continue planning mandatory after the first idea.
Common mistakes
Section titled “Common mistakes”- Creating
/projects/newfor every feature. - Asking MCP for a full remaining-product rewrite as the next wave.