Skip to content

Next wave after MVP

After MVP, add the next ranked slice with Continue planning. That re-enters Idea Lab for a new wave: phases, UX Spec skip-or-not, wave backlog. A new /projects/new would burn a project slot and split history.

Existing-product projects should also Continue planning for later waves — still next-wave only, never a rewrite dump.

  • Who: Planner after the first backlog wave shipped or is in flight
  • Time: A planning session, not a new workspace
  • Plan: Same project limits as your plan (Free = 1 project — Continue planning is how you stay inside it).
  • Add a wave without creating a second project.
  • Keep living or classic PRD history on one project.
  • Sprint 1 is done or in flight and you have a new goal.
  • An existing GrowthOS project with at least one planned wave.
  • Project home → Continue planning.
  • Idea Lab on that same project.
  1. Write the next-wave goal in one sentence.
  2. Open Continue planning — not /projects/new.
  3. Approve new delivery phases. Skip UX Spec only if this wave has no UI.
  4. Generate the wave backlog. On Pro+, plan the next sprint from it.
  • One project, two (or more) waves. No orphan second project.
  • Free’s 1-project cap makes Continue planning mandatory after the first idea.
  • Creating /projects/new for every feature.
  • Asking MCP for a full remaining-product rewrite as the next wave.